The following text is taken from the City of Utica Planning Board's PDF file located here Draft Scoping Document 5-18-18a [Copy on #NHD server here: draft-scoping-document-5-18-18a.pdf].
MOHAWK VALLEY HEALTH SYSTEM (“MVHS”)
INTEGRATED HEALTH CAMPUS (“IHC”)
STATE ENVIRONMENTAL QUALITY REVIEW ACT (“SEQRA”)
DRAFT SCOPING DOCUMENT
FOR
DRAFT ENVIRONMENTAL IMPACT STATEMENT
1.1 INTRODUCTION Pursuant to New York State Environmental Conservation Law Article 8 (State Environmental Quality Review Act, “SEQRA”), Part 617 of Chapter 6 of the New York Code of Rules and Regulations, and the adoption of a Notice of Determination of Significance” (“Positive Declaration”) by the City of Utica Planning Board, acting as SEQRA Lead Agency in a coordinated review process, the City of Utica Planning Board intends to prepare a Draft Environmental Impact Statement (“DEIS”) for the Integrated Health Campus Project (“IHC Project”) proposed by the Mohawk Valley Health System (“MVHS” or “Project Sponsor”). In accordance with SEQRA, the DEIS is required to address specific adverse environmental impacts, which can be reasonably anticipated.
Pursuant to SEQRA implementing regulations (6 NYCRR § 617.9(a)(1)), the Project Sponsor or the Lead Agency, at the Project Sponsor's option, will prepare the DEIS. As the Project Sponsor, MVHS has prepared this Draft Scoping Document. The primary goals of scoping are to focus the DEIS on potentially significant adverse impacts and to eliminate consideration of those impacts that are irrelevant or nonsignificant. As a draft scoping document, the following information is contained herein (6 NYCRR § 617.8) for public and agency review:
A brief description of the proposed action (Section 1.3)
The potentially significant adverse impacts identified in the “Positive Declaration” and as a result of consultation with the other involved agencies and the public, including an identification of those aspects of the environmental setting that may be impacted (Section 1.4)
The extent and quality of information needed for the preparer to adequately address each impact, including an identification of relevant existing information, and required new information, including the required methodology(ies) for obtaining new information (Section 1.4)
An initial identification of mitigation measures to avoid or minimize adverse environmental impacts (Section 1.4)
The reasonable alternatives to be considered (Section 1.9)
An identification of the information/data that should be included in an appendix rather than the body of the DEIS (Section 1.10)
As Lead Agency, the City Planning Board will provide a copy of the draft Scoping Document to all involved agencies, post it on the Project’s website, and make it available to any individual or interested agency that has expressed an interest in writing to the Lead Agency. Involved agencies should provide written comments reflecting their concerns, jurisdictions and informational needs sufficient to ensure that the EIS will be adequate to support their SEQRA Findings1. Failure of an involved agency to participate in the scoping process will not delay completion of the final written scope. Written comments will be accepted by the Lead Agency at the address noted below from May 18, 2018 to June 20, 2018. Written comments should be forward to:
1 SEQRA Findings (Findings Statement) means a written statement prepared by each involved agency, in accordance with SEQRA implementing regulations (6 NYCRR § 617.11), after a final EIS has been filed, that considers the relevant environmental impacts presented in an EIS, weighs and balances them with social, economic and other essential considerations, provides a rationale for the agency's decision and certifies that the SEQRA requirements have been met.
OBG | THERE ’ S A WAY
PAGE 2
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
City of Utica Planning Board
Attention: Mr. Brian Thomas, Commissioner
City of Utica, Department of Urban & Economic Development
1 Kennedy Plaza
Utica, NY 13502
Phone Number: (315) 792-0181
Email: bthomas@cityofutica.com
The scoping process will also include an opportunity for public participation. The City Planning Board has scheduled a public scoping meeting for June 7, 2018, which will be held in Conference Rooms A and B at the New York State Office Building, 207 Genesee Street, Utica, New York 13501. A presentation will begin at 5:30pm and a Public Hearing will begin at 6:00pm. Oral comments received at the public scoping meeting will be recorded.
A Final Scoping Document will be prepared and issued by the City Planning Board, as SEQRA Lead Agency, which incorporates substantive comments received during the public and agency comment period. The Final Scoping Document will also identify those prominent issues that were raised during scoping and determined by the Lead Agency to be not relevant or not environmentally significant or that have been adequately addressed in prior environmental review (Section 1.11).
All relevant issues should be raised before the issuance of a final written scope. Any agency or person raising issues after that time must provide to the Lead Agency and Project Sponsor a written statement that identifies:
The nature of the information
The importance and relevance of the information to a potential significant impact
The reason(s) why the information was not identified during scoping and why it should be included at this stage of the review
The Project Sponsor may incorporate information submitted after the issuance of a final written scope into the DEIS at its discretion. Any substantive information not incorporated into the DEIS must be considered as public comment on the DEIS.
Information on the project and scoping process are available on the project’s SEQRA website ( http://www.cityofutica.com/departments/urban-and-economic-development/planning/mvhsseqra/index). The project website is also accessible from the City of Utica’s home page (http://www.cityofutica.com).
1.2 PROJECT PURPOSE Faxton St. Luke’s Healthcare (“FSLH”) and St. Elizabeth Medical Center (“SEMC”) affiliated in 2014 to become MVHS2. MVHS’s mission is to provide excellence in healthcare for its communities. Substantial effort has been focused on consolidating existing resources, eliminating redundancies, expanding the depth and breadth of services, improving access and elevating the quality of healthcare services in the region. MVHS has been successful in its efforts thus far, but has been constrained by the age and physical limitations of the existing facilities.
2 Mohawk Valley Health System is the Sole Corporate Member of Faxton-St. Luke`s Healthcare, St. Elizabeth Medical Center, St. Luke's Home Residential Health Care Facility, Senior Network Health, LLC, Visiting Nurse Association of Utica and Oneida County, Inc., and Mohawk Valley Home Care, LLC. Together, the system is governed by one Board of Directors. As referenced in its certificate of need application for construction of the new hospital, MVHS plans to apply for a certificate of need from the Department of Health pursuant to Article 28 of the Public Health Law pursuant to which it also would be the sole operator of the new integrated hospital campus.
OBG | THERE ’ S A WAY PAGE 3 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
As summarized below, FSLH and SEMC are currently comprised of three locations (see Figure 1). FSLH Campus Locations SEMC Campus Location
St. Luke’s Campus 1656 Champlain Avenue, Utica, NY
SEMC Campus 2209 Genesee Street, Utica, NY
Faxton Campus 1676 Sunset Avenue (1675 Bennett Street), Utica, NY
To support goals to deliver higher quality, more effective care with better community outcomes and at a lower cost, the proposed MVHS IHC, will combine services from both St. Luke’s and SEMC. The new MVHS IHC and hospital will replace the St. Luke’s and SEMC campuses, reduce the number of beds in the community, and consolidate patient services to one campus; Faxton Campus services will not move to the new IHC.
The decision to consolidate these two campuses to a single facility was motivated by several key factors:
The desire and need to build a facility with the newest technology, services and advancements in patient safety and quality so that our community can receive the most up-to-date healthcare services that rivals those found in large cities
The growing demand for healthcare due to the rapidly increasing and aging population in this region
The increasing need to improve accessibility and availability by attracting specialists and providing services that otherwise would not be available to our community
The opportunity to gain greater operational efficiencies through the elimination of duplicative and redundant functions will help to reduce the rate of increase in healthcare spending and to achieve improved financial stability
Funding for the project has been provided, in part, by New York State via the Oneida County Health Care Facility Transformation Program, which provided capital funding ($300 million) “in support of projects located in the largest population center in Oneida County that consolidate multiple licensed health care facilities into an integrated system of care.” (https://www.nysenate.gov/legislation/laws/PBH/2825-B)
1.3 PROJECT DESCRIPTION As depicted on Figure 2 (Site Location Map), the MVHS IHC will generally be bounded by Oriskany Boulevard (NYS Route 69) to the north, Broadway to the east, Columbia Street and NYS Route 8 to the west, and City Hall and Kennedy Apartments to the south. The MVHS IHC will encompass approximately 25-acres and will include the following elements:
Hospital building
Central utility plant
Parking facilities (including one municipal parking garage and multiple surface lots)
Potential future medical office building (by private developer)
Campus grounds
Helistop
To accommodate the proposed MVHS IHC, the proposed project will involve the acquisition of properties and modifications to existing public/private utility infrastructure.
OBG | THERE ’ S A WAY PAGE 4 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Descriptions of the project elements are provided below, as well as a description of the intended future use of the two existing St. Luke’s and SEMC campuses. These descriptions represent the project as currently envisioned.
HOSPITAL BUILDING The proposed ±670,000 square foot (sf) hospital building will be constructed on parcels located west of Broadway and will extend through Cornelia Street onto parcels located east of State Street. The hospital building consists of a 2-story podium and a 7-story bed tower. The main entrance to the hospital will be located south of Lafayette Street, proximal to Cornelia Street. In addition to the main entrance, Emergency Department (“ED”) walk-in and ED ambulance entrances will be located on the western portion of the hospital. Vehicular and pedestrian entries will be marked by canopy systems that provide adequate coverage for public drop off, ED walk-in and loading activities. Ambulance traffic will be provided with a large drive-thru canopy adjoined to the podium. A service entrance will be located on the eastern portion of the hospital building, which will be accessible via Columbia Street. Most services currently provided at the St. Luke’s and SEMC campuses will be transitioned to the MVHS IHC including ±373 inpatient beds.
CENTRAL UTILITY PLANT A three-story Central Utility Plant (“CUP”) will service the hospital. The CUP will adjoin the eastern portion of the podium of the hospital building. The CUP will house three centrifugal chillers, a heat recovery chiller and four steam and eight hot water heating condensing boilers, each which will be fueled by both natural gas and No. 2 Fuel oil. A 50,000-gallon underground storage tank (“UST”) used to store the No. 2 fuel oil will be installed south of the CUP in the service yard. A 30,000-gallon aboveground storage tank (“AST”) used to store emergency water for fire protection will also be located in the service yard.
PARKING FACILITIES Parking facilities will consist of a three-story, municipally-owned parking garage and multiple parking lots. The parking garage will provide approximately 1550 parking spaces and the parking lots will allow for an additional ±1100 parking spaces. These parking facilities will be available for use by patients, visitors, staff, and volunteers, as well as the community for non-hospital related events.
POTENTIAL FUTURE MEDICAL OFFICE BUILDING A future medical office building is proposed. It is anticipated that the medical office building would be owned and operated by a private developer. As illustrated on Figure 2, the proposed location of the medical office building is south of Columbia Street and east of Cornelia Street.
CAMPUS GROUNDS The campus will be designed as an urban park with enhanced lighting, trees, pedestrian walkways and seating areas. A pedestrian walkway will replace a portion of Lafayette Street. This walkway will extend from the main entrance to the west, terminating just adjacent to the North-South Arterial Highway. An additional segment of the walkway will provide access to the ED entrance. Outdoor areas will include gardens and other design considerations to create a healing environment.
OBG | THERE ’ S A WAY
PAGE 5
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
HELISTOP A helistop3 will be situated to the west of the hospital building, adjacent to the ED ambulance entrance and north of Columbia Street. Approximately 40± annual emergency flights to the hospital are anticipated.
PROPERTY ACQUISITION The project includes the acquisition of the 25± acres of property in an area of Utica that is designated as a Federal “Historically Underutilized Business” (“HUB”) Zone4, a distressed area and a New York State Department of Environmental Conservation (“NYSDEC”) designated “Potential Environmental Justice Area.” While it is anticipated that most of the property will be acquired through voluntary negotiation, it is likely that some property may need to be acquired via eminent domain. Many of the existing property owners and businesses will be required to relocate to other parts of Utica or Oneida County. The magnitude of the acquisition of 25+/- acres will be large, but most impacts are expected to be beneficial because it will better position the hospital to serve the largest and most diverse population in Oneida County, as well as creating the potential for secondary economic development opportunities.
STREET CLOSURES As currently proposed, the project would require the following public street closures or changes in designation:
Lafayette Street from the North-South Arterial Highway to Broadway will be abandoned by the City
Cornelia Street from Columbia Street to Oriskany Street will be abandoned by the City
Carton Avenue, Sayre Alley, and Pine Street will be abandoned by the City
The former Lafayette Street from Broadway to Cornelia Street will become the main entrance to the IHC
The former Cornelia Street from Lafayette Street to Oriskany Street will become the entrance to the new public parking garage and an alternate hospital entrance/exit
UTILITY INFRASTRUCTURE Based on a preliminary assessment of existing utilities and project needs, modifications to the existing infrastructure in the project area are anticipated. A summary of anticipated modifications is provided below.
Sanitary Sewers It is anticipated that the existing sanitary sewer line within the right-of-way (“ROW”) of Cornelia Street between Columbia and Lafayette Streets, and in the ROW of Lafayette Street between Cornelia and State Streets, will be abandoned/removed. A new sewer line within the ROW of Columbia Street will be constructed from Cornelia Street to the 48” (diameter) trunk sewer along State Street. A new sewer line would be constructed to divert upstream flow from the south on Cornelia Street to the existing sewer on Broadway via a rehabilitated existing or newly constructed sewer in Columbia Street between Cornelia Street and Broadway. Other potential new sewers lines may be needed along Lafayette Street, abutting the north side of the hospital. The location and size of sanitary laterals and connections will depend on the plumbing/mechanical design of the new hospital buildings. It is assumed each new structure will have its own service lateral(s) connecting to the City mains.
3 A helistop is a minimally developed helicopter facility for boarding and discharging passengers or cargo, without the support facilities found at a heliport.
4 HUBZone means a historically underutilized business zone, which is an area located within one or more: (1) Qualified census tracts; (2) Qualified non-metropolitan counties; (3) Lands within the external boundaries of an Indian reservation; (4) Qualified base closure areas; (5) Re-designated areas; or (6) Qualified disaster areas.
OBG | THERE ’ S A WAY
PAGE 6
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Wastewater associated with hospital operations is anticipated to be ±187,000 gallons per day (gpd) and will be discharged to Oneida County’s Water Pollution Control Plant via City sanitary sewers and Oneida County interceptor sewers.
Storm Sewers The overall percent impervious surfaces resulting from development of the IHC is anticipated to be less than the amount of coverage under existing conditions. In addition, the buildings and paved impervious surface areas of the MVHS IHC may be further minimized or reduced using “Green Infrastructure” design features such as pervious pavement/pavers, planting beds, and subsurface rainwater detention.
It is anticipated that the existing storm sewer lines within the ROW of Cornelia Street between Columbia and Lafayette Streets will be abandoned/removed. Removal of portions of storm sewer lines may also be required along Lafayette Street between Cornelia and State Streets. New storm sewer piping will be installed in the ROW along State Street and connect to the existing New York State Department of Transportation (“NYSDOT”) storm sewer line, which connects to the north side of Oriskany Street West/Route 5S, west of the Utica Memorial Auditorium (“Aud”). Alternatively, storm sewers will be constructed from the intersection of State Street and Oriskany Street west to the existing storm sewer at Cornelia Street and Oriskany Street. New branch lines will tie-in catch basins along the west end of Columbia Street. Flow from the east side of the campus and upstream flow from Broadway will be conveyed through existing storm sewers in Cornelia Street, north of Lafayette, Lafayette Street east of Cornelia, and Broadway.
Water Mains Water mains located in the ROW along portions of Lafayette Street may need to be removed/abandoned, as would other smaller mains within the new building footprint. Where new supply mains are required, the older mains would be replaced. Fire hydrants will be located along the public streets and private fire hydrants will be located within the IHC campus, as required for fire protection. Each building will be provided with its own backflow prevention device to comply with Mohawk Valley Water Authority requirements.
Water mains to be replaced or installed include: 1) older 6” and 16” mains on State Street will be replaced with a new 16” water main; 2) a 6”/8” main on Broadway that will be replaced with a 12” pipe connecting large mains on Columbia to Whitesboro Street; 3) 12” water main along Oriskany Street East between State Street and Broadway; and 4) 12” water main (private) along Lafayette Street to serve the IHC.
Electric and Natural Gas Electric and gas utilities in the area of the proposed IHC are operated and maintained by National Grid. The gas mains and underground electric conductors are owned by National Grid. The underground conduits and vaults are owned by the City of Utica, and leased to National Grid for use. Both electric and gas assets exist extensively throughout the IHC project footprint, including a 13.2 KV underground feed in Cornelia and Lafayette Streets. All assets, both electric and gas, will need to be relocated out of the IHC footprint, into public rights-of-way; locations are to be determined through on-going coordination between MVHS, National Grid and the City.
INTENDED FUTURE USE OF EXISITING HOSPITALS
Disposition and Repurposing of Existing Hospital Campuses
With the exception of certain existing ancillary facilities within which existing operations will be maintained (see below), MVHS’ objective is to facilitate redevelopment of the existing St. Luke’s and SEMC campuses consistent with the Town of New Hartford’s and the City of Utica’s long-term development plans and capable of making an economically positive contribution to each community. In support of this objective, MVHS will be conducting an evaluation of the properties and potential “as-of-right”5 redevelopment opportunities
5 Consistent with existing zoning designations and regulations.
OBG | THERE ’ S A WAY
PAGE 7
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
concurrent with planning for the proposed hospital. In addition to the disposition and redevelopment of the primary facilities, existing ancillary facilities will also be reused. A description of the anticipated continued use of portions of the existing campuses is provided below.
St. Luke’s Most of the inpatient and outpatient services performed at the existing St. Luke’s campus will be transitioned to the MVHS downtown IHC. However, it is anticipated that ±24 physical medical and rehabilitation beds, as well as some outpatient services will remain at this site. Unused medical supplies and certain medical equipment will be brought to the MVHS IHC. Medical equipment that is beyond its useful life will be disposed of in accordance with applicable federal and state regulations.
SEMC The non-hospital buildings located at the SEMC Campus will be converted into an outpatient extension clinic. Services provided at the clinic will include sleep center services, cardiac and thoracic surgery-related physician offices, primary care services and a laboratory patient service center. Unused medical supplies and certain medical equipment will be brought to the MVHS IHC. Medical equipment that is beyond its useful life will be disposed of in accordance with applicable federal and state regulations.
1.4 POTENTIALLY SIGNIFICANT ADVERSE ENVIRONMENTAL IMPACTS
During the Lead Agency Coordination, Notice of Determination, and Scoping processes, potentially significant adverse environmental impacts were identified including both short-term, construction related activities, and long-term impacts associated with the operation of the proposed IHC. The table below identifies these potential impacts by topic and includes the following information for each:
The potentially significant adverse impacts identified in the “Positive Declaration”, and as a result of
consultation with the other involved agencies and the public, including an identification of those aspects of
the environmental setting that may be impacted
The extent and quality of information needed to adequately address each impact, including an identification
of relevant existing information, and required new information, including the required methodology(ies) for
obtaining new information
An initial identification of mitigation measures to avoid or minimize adverse environmental impacts
OBG | THERE ’ S A WAY
PAGE 8
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Impact on Land (Geology, Soils, Topography)
Construction
Physical alteration of >10-acres of land
and construction that continues for
more than one year or in multiple
phases
Excavation and removal of more than
1,000 tons of material including
removal and disposal of unsuitable fill
material and/or impacted soil, if
encountered
Increase in erosion, whether from
physical disturbance or vegetation
removal (including from treatment by
herbicides)
Operation
No significant adverse impacts anticipated; proposed postconstruction conditions will result in an increase in pervious greenspace
Existing Information Sources
Limited Phase I Environmental Site
Assessment (Phase I ESA)
Previous geotechnical investigations on
properties proximal to the proposed
project area
Information from the Soil Survey of
Oneida County, New York published by
the United States Department of
Agriculture (“USDA”) Natural Resources
Conservation Services (“NRCS”) and
other readily available existing
resources (e.g.,
https://websoilsurvey.sc.egov.usda.go
v/App/WebSoilSurvey.aspx) will be
relied on to describe surface (soil) and
subsurface (bedrock) conditions
Additional desktop/web-based
environmental database reviews
Additional Information Needs
Topographical survey
Subsurface geotechnical investigation
(evaluate constructability issues such as
depth to bedrock and groundwater,
seismicity, soil permeability, erosion
potential, etc., as well as potential
surface and subsurface impacts
associated with past land use)
Construction
Obtain coverage under NYSDEC’s
General Permit for Stormwater
Discharges from Construction Activity
(GP-0-15-002)
Preparation and implementation a of
Stormwater Pollution Prevention Plan
(“SWPPP”) including an Erosion and
Sedimentation Control (“E&SC”) Plan
prepared in accordance with local and
State standards to mitigate
construction phase stormwater runoffrelated
impacts
Restricting the limits of construction to
the minimum practicable area required
to complete the work
Management (handling and disposal) of
impacted soils/subsoils in accordance
with applicable local, state and federal
requirements
Timely and effective restoration of
temporarily disturbed areas
Constructability issues identified in the
geotechnical investigation will be
considered in the design of the IHC
Operation
Implementation of long-term
stormwater management controls to
control the rate and quality of runoff
prior to leaving the site
Use of landscaping to minimize erosion
potential
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Impact on Geologic Features (i.e., unique or unusual land forms) Based on review of existing information sources, no unique or unusual land forms were identified within or proximal to the project site.
Existing Information Sources
Information from the Web Soil Survey
developed by the USDA NRCS (Available
at: https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx)
National Natural Landmarks Program, National Registry of Natural Landmarks,
June 2009 (https://www.nps.gov/subjects/nnlandmarks/upload/NNLRegistry.pdf)
No significant impacts to geologic features were identified; no mitigation measures are warranted.
Impact on Surface WaterConstruction
Potential temporary impacts (sediment laden runoff) to surface waters from
demolition/construction activities including ground disturbances (e.g.,
excavation or installation of utilities), construction of temporary roads and
access facilities, grading, and landscaping
Potential to encounter impacted surface/groundwater due to past land use(s)
Operation
Potential impacts from outdoor storage of materials (if any) and runoff from impervious areas (including parking lots)
Existing Information Sources
NYSDEC’s Environmental Resource Mapper (http://www.dec.ny.gov/gis/erm/)
Additional Information Needs
Topographical survey
Site layout illustrating outdoor storage
areas
Project grading and E&SC plan
Construction sequencing
SWPPP
Subsurface data
Construction
Preparation and implementation of a SWPPP including an E&SC Plan prepared in accordance with local and
State standards to mitigate construction phase impacts
Management (handling and disposal) of impacted soils/subsoils and groundwater in accordance with applicable local, state and federal requirements
Operation
Management of stormwater runoff in accordance with local and state requirements
Conveyance of wastewater/sanitary discharges to Oneida County’s Water Pollution Control Plant in accordance
with the local sewer ordinance
OBG | THERE ’ S A WAY
PAGE 10
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impact on Groundwater
Construction
Potential impacts to groundwater associated with dewatering during construction activities
Potential to encounter aboveground and/or underground storage tanks (ASTs and USTS, respectively) during demolition/excavation activities, as well as, impacted soil/groundwater from past land use(s)
Operation
Potential impacts relating to the bulk storage of oil/fuel and/or chemicals
Existing Information Sources
Information from the Web Soil Survey developed by the USDA NRCS (Available at: https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx) and other readily available existing resources will be relied on to describe groundwater conditionsAdditional Information Needs
Subsurface data
Project-related bulk storage requirements and locations
Stormwater management (conceptual design)
Construction
Preparation and implementation of a SWPPP including an E&SC Plan
prepared in accordance with local and State standards to mitigate
construction phase impacts (including a ground water management plan, if
encountered)
Preparation and implementation of a
Construction Health and Safety Plan
(“CHASP”) to protect construction
workers and the community from
exposure to potential impacted
materials
Removal of any encountered ASTs and
USTs will be conducted in accordance
with NYSDEC-regulated PBS and/or CBS
closure requirements, as well as waste
characterization, management,
handling and disposal, as applicable
Operation
Installation and operation of NYSDEC regulated
PBS and/or CBS tanks will be
conducted in accordance with
applicable NYSDEC regulations,
including design requirements including
secondary containment, PBS and CBS
registration certificates, operation and
maintenance requirements. In addition,
spill prevention plans (e.g., Spill
Prevention, Control and
Countermeasure Plan, Spill Prevention
Report) will be developed and
implemented, as applicable
OBG | THERE ’ S A WAY
PAGE 11
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
OBG | THERE ’ S A WAY
PAGE 12
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impacts on Aesthetic Resources (including Lighting Impacts)
Construction
Temporary construction-related lighting
impacts from mobile sources (e.g.,
trucks, heavy machinery)
Operation
Outdoor lighting will include signage,
lamp posts and building-mounted
fixtures in exterior parking areas,
walkways and entrances to the hospital,
as applicable, which may result in light
shining onto adjoining properties and
creating sky-glow brighter than existing
area conditions
Potential impacts on viewshed due to
the proposed height of the building
Existing Information Sources
Utica City Code. Available at:
Additional Information Needs
Conceptual lighting design (types and locations)
Architectural renderings
Construction
The project will require approval of a site plan by the City Planning Board, as well as City issuance of building permits based on compliance with the New York State Building Code.
Operation
Adherence to New York Building Code requirements including the use and placement of outdoor lighting fixtures that reduce glare and spillover
OBG | THERE ’ S A WAY PAGE 1 4 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impact on Historic and Archaeological Resources
Construction
Potential impacts to archaeological
resources due to in ground
disturbances
Construction/Operation
Potential impacts to historic properties
located within or substantially
contiguous to the IHC project area,
including:
» parcels listed or eligible for listing on
the State or National Registers of
Historic Places
» parcels located in the Upper
Genesee Street Historic District
The proposed action will result in the
destruction or alteration of all or part of
the site or property
The proposed action may result in the
introduction of visual elements, which
are out of character with the site or
property, or may alter its setting
Existing Information Sources
The New York State Historic Preservation Office (“SHPO”) online Cultural Resource Information System
(“CRIS”). Available at: https://cris.parks.ny.gov/Login.aspx?ReturnUrl=%2f
Additional Information Needs
Historic Structure & Building Inventory
Survey
Phase 1A Cultural Resource Survey
Architectural renderings
SHPO consultation
Construction
Approval, in consultation with SHPO, of
a Programmatic Agreement for the
minimization and mitigation of
potential adverse effects on historic or
archaeological resources
Adherence to conditions identified in
the Programmatic Agreement
Impacts on Open Space and Recreation
Based on a review of existing information
sources, the proposed project area does
not currently contain open space or
recreational resources.
Existing Information Sources
Aerial photography/Site reconnaissance
Tax parcel information
No significant impacts on open space and recreation were identified; no mitigation measures are warranted.
Impacts on Critical Environmental Areas (“CEAs”)
Based on a review of existing information sources, the proposed project area is not located within a NYSDEC-designated CEA.
Existing Information Sources
NYSDEC-identified CEAs available at
https://www.dec.ny.gov/permits/618
4.html
No significant impacts on CEAs were identified; no mitigation measures are warranted.
OBG | THERE ’ S A WAY
PAGE 15
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impact on Transportation
Construction
Temporary road closures
Construction vehicle & equipment/material staging
Impacts to bus service (routes, stops)
Increased demand for parking (construction workers)
Existing Information Sources
Traffic flow data compiled by NYSDOT
(https://www.dot.ny.gov/divisions/en
gineering/applications/traffic-dataviewer)
Additional Information Needs
Traffic Impact Study with study limits coordinated with NYSDOT and City of Utica
Maintenance & Protection of Traffic Plan
Construction
Development and implementation of a Maintenance and Protection of Traffic Plan
Temporary changes to street signals, signage, and traffic routes
Temporary bus lanes or bus stops to account for service disruptions
Traffic control personnel (flaggers)
Operation
Addition and/or relocation of bus service stops
Increase bus fleet to allow for additional capacity
Parking regulation modifications
Addition of or modification to pedestrian facilities
Implementation of road improvements to maintain adequate flow of vehicles on streets (i.e., levels of service) proximal to the project (as specified in the Traffic Impact Study)
OBG | THERE ’ S A WAY PAGE 16 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impacts on Utilities
Construction
Temporary impacts due to the abandonment/removal; and installation
of utilities (e.g., sanitary and storm sewer, water, electric and natural gas).
Specific construction-related impacts are identified elsewhere in this scoping
document
Operation Although improvements/modifications to the existing utility infrastructure will be necessary to provide adequate services to the IHC, the utility systems themselves currently have sufficient capacity to service the IHV. Therefore, no significant adverse impacts on utility infrastructure capacities are anticipated
Existing Information Sources
Existing, readily available information will be relied upon to assess impacts on utilities including a comparison to the current utility needs of St. Luke’s and SEMC
Additional Information Needs
Will-serve letters from purveyors or other documentation that the project will not result in significant adverse impacts on existing utility capacities
Construction
Implementation of E&SC measures during installation of utility improvements
Implementation of a Maintenance & Protection of Traffic Plan to maintain traffic flow during installation of utilities
within road ROWs (including acquisition of highway work permits from jurisdictional authorities)
Operation
No significant impacts on utilities from operation of the project were identified; no mitigation measures are warranted.
OBG | THERE ’ S A WAY PAGE 17 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impacts on Energy (Including the Use and Conservation of Energy)
Construction
Significant adverse impacts to energy are not anticipated.
Operation
The peak electrical demand load for the proposed MVHS IHC is estimated to be 4.2 Megavolt-Amperes (“MVA”). Although upgrades to the exiting electrical distribution system may be required to adequately service the IHC, the electrical demand is not anticipated to significantly impact the grid
The proposed action will involve heating and/or cooling of more than 100,000 sf of building area when completed
Diesel-fueled emergency generators will also be used at the proposed MVHS IHC Existing Information Sources
Existing, readily available information will be relied upon to assess impacts on energy including comparisons to the current energy consumption of St. Luke’s and SEMC
Additional Information Needs
Estimated energy usage information, including any need to upgrade existing services, will be obtained from National Grid
Energy conservation efforts (including LEED certification requirements, if applicable)
Construction
Implementation of E&SC measures during installation of utility improvements
Implementation of a Maintenance & Protection of Traffic Plan to maintain traffic flow during installation of utilities within road ROWs (including acquisition of highway work permits from jurisdictional authorities)
Operation
Implementation of energy-saving measures (e.g., LEED certification)
OBG | THERE ’ S A WAY
PAGE 18
I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping
Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures
Impact on Noise and Odor
Construction
Temporary construction-related noise
impacts from the following:
Equipment necessary to prepare the project area (including demolition) and
construct the proposed MVHS IHC
Vehicles and equipment accessing and egressing the site including trucks hauling C&D debris for off-site management
Temporary power generators Significant adverse odor impacts are not anticipated.
Operation
Sporadic noise in excess of existing ambient levels during operation may be generated by incoming ambulances and helicopter flights
Significant adverse odor impacts are not
anticipated.
Existing Information Sources
Existing, readily available information will be relied upon to assess noise and odor impacts (including construction equipment noise data published on the internet)
Utica City Code. Available at: https://ecode360.com/UT2994
Additional Information Needs
Identification of construction and operation phase noise sources
Identification of construction and operation phase odor sources.
Traffic Impact Study
Proposed operational equipment needs, quantities, and locations
Projected number of annual helicopter flights
Construction
Noise impacts will be short-term and intermittent and mitigated through implementation of controls identified in the DEIS which may include:
» Adherence to a City-approved construction schedule (The NYSDEC Program Policy “Assessing and Mitigating Noise Impacts” suggests that limiting activity to normal workday hours is an effective mitigation measure)
» Use and maintenance of appropriate mufflers on vehicles and equipment
» Compliance with the municipal noise ordinance and City code
requirements
Operation
Compliance with City Code requirements
OBG | THERE ’ S A WAY PAGE 19 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Impact on Human Health
Construction
Vehicles and equipment accessing and egressing the project site
Disturbance of hazardous building materials during demolition activities
(e.g., asbestos, lead, etc.)
Potential to encounter impacted soils/groundwater (from past or existing land use)
Operation
Use of hazardous materials and generation of solid and hazardous wastes including Regulated Medical Waste (“RMW”)
The proposed action is located within 1500 feet of three licensed day carecenters (i.e., sensitive receptors)
The project or adjacent area includes asite(s) with a completed emergency spill remediation, or a completed environmental site remediation
The proposed action will result in an increase in the rate of disposal, or processing, of solid waste
A CSX railroad is located ±900 feet north of the proposed project area.
The proposed action will include the use of pesticides or herbicides
Existing Information Sources
Desktop environmental database review
Oneida County Comprehensive Emergency Management Plan available at:
Limited Phase I ESA
Additional Information Needs
Maintenance and Protection of Traffic Plan
Geotechnical investigation (including an assessment of potential surface and subsurface impacts associated with past land use)
Waste management practices
Construction
Preparation and implementation of a
CHASP to protect construction workers
and the community from exposure to
potential impacted materials
Contractors will be required to perform
hazardous building material surveys of
proposed demolition properties
Disposal of regulated materials/wastes
in accordance with local, State and
federal requirements
Operation
Operation of the IHC will require the
use of chemicals and other potentially
hazardous materials and generation of
hazardous wastes. These materials and
wastes will be stored, handled and
managed in accordance with applicable
local, State and federal requirements
Use of herbicides and pesticides will be
in accordance with applicable local,
State and federal requirements
Coordination with the State Emergency
Response Commission (i.e., Homeland
Security and Emergency Services) and
Local Emergency Planning Committee(s)
(“LEPC”)
Implementation of existing emergency
response plans
OBG | THERE ’ S A WAY PAGE 20 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx Environmental
Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Consistency with Community Character and Plans Construction Acquisition (via voluntary negotiation and eminent domain) and demolition or alteration of properties in the proposed project area Operation Land-use components will be different from current surrounding land use pattern(s) Potential to result in secondary economic development impacts (e.g., residential or commercial development) Potential to replace or eliminate existing facilities, structures, or areas of historic importance to the community Potential to displace affordable or lowincome housing The proposed action may be inconsistent with the predominant architectural style and character of the area Existing Information Sources Conceptual site plan SHPO CRIS; http://cris.parks.ny.gov/Login.aspx?Re turnUrl=%2f Zoning ordinance City Master Plan. Available at: http://www.uticamasterplan.org/mp_ downloads.htm Additional Information Needs Historic Structure & Building Inventory Survey Architectural renderings Public Participation Plan SHPO consultation The project will require approval of a site plan by the City Planning Board, as well as City issuance of building permits based on compliance with the New York State Building Code Adherence to conditions identified in the SHPO-approved Programmatic AgreementOBG | THERE ’ S A WAY PAGE 2 1 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx Environmental Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Impacts on Solid Waste Management Construction Temporary increase in the rate of disposal or processing of solid waste from construction/demolition activities The need to manage impacted soils/groundwater and/or hazardous building materials Operation Waste generation (solid waste, hazardous waste and RMW Existing Information Sources 2010 Oneida-Herkimer Solid Waste Management Plan Additional Information Needs Project-related solid waste generation estimates Management methods and locations Construction Evaluation of material selection for interior and exterior building materials for recycled content and local materials Diversion of construction and land clearing debris from landfill disposal (if applicable) Redirecting recyclable-recovered resources (including demolition materials) back to the manufacturing process Redirecting reusable materials to beneficial applications Operation Solid waste and recyclables will be managed in accordance with applicable local, State and federal requirements Consistency with the County’s Solid Waste Management Plan RMW will be hauled by a NYSDECpermitted RMW transporter from the new hospital to the existing statepermitted autoclave and shredder located on the St. Luke’s campus prior to ultimate management off-site in accordance with applicable local, State and federal requirements
OBG | THERE ’ S A WAY PAGE 2 2 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx Environmental Topic Potential Significant Adverse Impacts Information Sources/Needs Potential Mitigation Measures Environmental Justice Potential displacement of affordable or low-income housing in NYSDECdesignated “Potential Environmental Justice Area” Existing Information Sources NYSDEC-designated Potential Environmental Justice Areas in the City of Utica. Available at: http://www.dec.ny.gov/docs/perm its_ej_operations_pdf/oneidaej.pdf Additional Information Needs Public Participation Plan Implementation of the Public Participation Plan
OBG | THERE ’ S A WAY PAGE 23 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
1.5 CUMULATIVE IMPACTS The DEIS will summarize the potential cumulative impacts of the proposed project in conjunction with other proposed and existing projects in the area. As defined in the NYSDEC’s SEQRA Handbook, cumulative impacts occur when multiple actions affect the same resource(s). These are impacts on the environment that result from the “incremental or increased impact of an action(s) when the impacts of that action are added to other past, present and reasonably foreseeable future actions. Cumulative impacts can result from a single action or a number of individually minor but collectively significant actions taking place over a period of time.” (http://www.dec.ny.gov/docs/permits_ej_operations_pdf/seqrhandbook.pdf) Cumulative impacts must be assessed when actions are proposed, or can be foreseen as likely, to take place simultaneously or sequentially in a way that the combined impacts may be significant. As with direct impacts, assessment of cumulative impacts should be limited to consideration of reasonably foreseeable impacts, not speculative ones. Based on an initial consultation with the City’s Department of Urban & Economic Development, the following projects were identified as potentially occurring within or proximal to the project area and within a similar timeframe as the proposed IHC project: Expansion of the Utica Memorial Auditorium, including the proposed NEXUS Center (“NEXUS”). NEXUS will be an approximately 170,000 sf tournament-based recreation play facility, utilized for ice hockey, box lacrosse, soccer, and other field sports that can be performed on a 200 x 85-foot playing surface. NEXUS will include three playing surfaces, 25± locker rooms, commercial office space, college classroom space, retail space, food and beverage services, and other multi-purpose training space. NEXUS is proposed to be developed on the block immediately east of the existing Auditorium, and will include the removal of Charles Street, an existing City street NYSDOT Route 5S (Oriskany Street) safety improvement project. Construction on this 2-year project began in April 2018, and will include reconstruction, re-aligning, and re-configuring intersections along Oriskany Street between Broadway and Broad Street City of Utica Combined Sewer Overflow (“CSO”) Control Project A9.2. Construction on this 6-month project will begin in May 2018, and will include construction of a large-diameter storm sewer from John Street to Broad Street, the rehabilitation and re-purposing of the existing Old Erie Canal Conduit between Seneca Street and John Street, and other incidental storm and sanitary sewer modifications within the project limits. The project will convey previously separated stormwater flows to a dedicated stormwater discharge point at Broad Street (Ballou Creek) Cumulative impacts on the following resources will be evaluated: Traffic Utility infrastructure. The evaluation will rely on existing, readily available information including environmental impact assessments prepared by others for those projects (if available). In addition, potential cumulative traffic impacts will be incorporated into the IHC project’s traffic impact study. 1.6 UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS The DEIS will summarize unavoidable adverse environmental impacts; these are impacts that cannot be avoided or fully mitigated. Both short- and long-term impacts will be identified.
OBG | THERE ’ S A WAY PAGE 24 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
1.7 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES The DEIS will summarize the natural and human resources that will be consumed, converted, or made unavailable for future use by the proposed project. Construction Commitment of previously developed land Commitment of resources (e.g., building materials) Operation Commitment of infrastructure (e.g., water, sewer, police/fire protection, electricity, natural gas, transportation network, solid waste management) Commitment of workforce 1.8 GROWTH INDUCING ASPECTS While growth-inducing effects (economic and social) of the IHC project may be beneficial to the region, induced growth may also be the prime source or cause of secondary environmental impacts. The growth inducement section of the DEIS will describe any further development, which the proposed action may support or encourage, such as: Attracting significant increases in local population by creating or relocating employment Providing support facilities or services Increasing the development potential of the surrounding area The growth inducement section of the DEIS will rely on growth projections/predictions, which are based on available information. The purpose of the discussion of growth inducement in the DEIS is to enable Involved Agencies to reach findings concerning both positive and negative effects of induced growth in the area of the proposed project. Growth inducting impacts will also address the future use/re-use of the existing facilities. MVHS is conducting an evaluation of the potential adaptive reuse of its existing facilities, which will form the basis of evaluation in the DEIS. 1.9 REASONABLE ALTERNATIVES To support the goal of delivering higher quality, more effective care with better community outcomes and at a lower cost, MVHS made the decision to consolidate the St. Luke’s and SEMC campuses to a single facility. This decision was spurred by several key objectives: The desire and need to build a facility with the newest technology, services and advancements in patient safety and quality so that our community can receive the most up-to-date healthcare services that rivals those found in large cities The growing demand for healthcare due to the rapidly increasing and aging population in this region The increasing need to improve accessibility and availability by attracting specialists and providing services that otherwise would not be available to our community In addition, funding for the project has been provided, in part, by New York State via the Oneida County Health Care Facility Transformation Program, which provided capital funding ($300 million) “in support of projects located in the largest population center in Oneida County that consolidate multiple licensed health care facilities into an integrated system of care.” (https://www.nysenate.gov/legislation/laws/PBH/2825-B)
OBG | THERE ’ S A WAY PAGE 25 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Considering these objectives and the capabilities of MVHS, a description and evaluation of reasonable project alternatives will be included in the DEIS. In addition to the required “no action” alternative, the DEIS will discuss:
Alternative sites6 » Downtown Utica Site (proposed Project Site) » Former NYS Psychiatric Center (“Old Main”) – 1213 Court Street, Utica, NY » St. Luke’s Hospital Campus – 1656 Champlin Avenue, New Hartford, NY » New Hartford Shopping Center7 – 120 Genesee Street, New Hartford, NY Alternative scale/magnitude Alternative design Alternative timing Under the “no action” alternative, MVHS would not relocate and consolidate the St. Luke’s and SEMC campuses to the proposed downtown MVHS IHC location. 1.10 ELEMENTS OF THE DEIS Draft Table of Contents for Draft Environmental Impact Statement Mohawk Valley Health System (“MVHS”) Integrated Health Campus (“IHC”) Utica, New York [Notice of Completion Date] Cover Sheet (including items listed in 6 NYCRR 617.9(b)(3)) Table of Contents Executive Summary Chapter 1: Project Overview 1.1. Project Description 1.1.1 Project Purpose (Public Need and Benefit) 1.1.2 Background and History 1.1.3 Project Location 1.1.4 Conceptual Design 1.1.4.1 Facilities 1.1.4.2 Access/Egress 1.1.4.3 Infrastructure 1.1.4.4 Storm Water Management 1.1.5 Construction Activities 6 The evaluation of alternatives will rely, in part, on “Draft Hospital Site Selection Process Summary Memo” provided by Mohawk Valley EDGE for MVHS (prepared by Elan Planning and O’Brien & Gere, June 2015). 7 Correspondence from New Hartford Shopping Center Trust to City of Utica Planning Board (received February 20, 2018).
OBG | THERE ’ S A WAY PAGE 26 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
1.1.6 Operation and Maintenance Requirements 1.1.7 Project Schedule (including phasing) 1.2. Regulatory Review and Approvals 1.2.1 State Environmental Quality Review Act (“SEQRA”) 1.2.2 Permits and Approvals 1.2.3 New York State Executive Orders and Policies Chapter 2: Alternatives Considered 2.1. Purpose 2.2. No Action Alternative 2.3. Alternative Sites 2.4. Alternative Scale/Magnitude 2.5. Alternative Design 2.6. Alternative Timing Chapter 3: Environmental Setting, Impacts, and Mitigation 3.#. – Applicable Environmental Topic (The following environmental topics will be included in the Draft EIS: Land, Surface Water, Groundwater, Air, Aesthetic Resources (including Light), Historic & Archaeological Resources, Transportation, Energy, Noise & Odor, Human Health, Community Character and Plans and Solid Waste Management). For each topic, the following narrative will be provided: 3.#.1. Existing Conditions 3.#.2. Potential Impacts 3.#.3. Mitigation Measures Chapter 4: Effects on the Use and Conservation of Energy Chapter 5: Cumulative Impacts Chapter 6: Unavoidable Adverse Environmental Impacts Chapter 7: Irreversible and Irretrievable Commitment of Resources Chapter 8: Growth Inducing Aspects References References cited in the document will be identified by title, source and date. Appendices SEQRA Documents (Lead Agency Coordination Materials, Full Environmental Assessment Form, Positive Declaration) SHPO Consultation Materials » Phase IA Cultural Resource Investigation » Historic Structure & Building Inventory Survey » SHPO Correspondence
OBG | THERE ’ S A WAY PAGE 27 I:\Mvhs.30780\67677.Utica-Hospital\Docs\Reports\Scoping\Draft Scoping Document 051818.Docx
Traffic Impact Study Subsurface Evaluations (Report & Data) Adaptive Reuse Report (Existing MVHS Facilities) 1.11 IRRELEVANT OR NON-SIGNIFICANT ISSUES OR IMPACTS In accordance with SEQRA implementing regulations (6 NYCRR 617.8(f)(7)), the following issues were determined not to be relevant or environmentally significant to the SEQRA process for this project (see EAF Part 2 – Identification of Potential Project Impacts): Impacts to Geological Features (e.g., cliffs, dunes, minerals, fossils, caves) Impacts on Flooding Impacts on Plants and Animals Impacts on Agricultural Resources Impacts on Open Space and Recreation Impact on Critical Environmental Areas (http://www.dec.ny.gov/permits/6184.html)
OBG THERE ’ S A WAY
FIGURES
O'BRIEN & GERE ENGINEERS, INC.
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
¥ MOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NEW YORK
FILE_NO. 67677
MAY 2018
5/3/2
018
3:3
3:3
8
P
M I:\M
vhs.3
0
7
8
0\6
7
6
7
7.Utica-H
ospital\D
ocs\D
W
G\GIS\Figure
_1_
E
xisting_
H
ospitals.m
xd
0 0.5 1 2
Miles
EXISTING MVHS FACILITIES
FIGURE NO. 1
SEMC Campus
St. Luke's Campus
Proposed Integrated Health Campus
Legend
City of Utica Boundary
FIGURE NO. 2
OBG | THERE ’ S A WAY PAGE 1